The truth of the quote · 006 taking over contract operate

I received the website, but there are no materials to edit.

About 5 minutes to read BlueCanvas

What should I receive when taking over my website?

The next person in charge must receive materials to continue the work. There are six types: server/hosting connection information, entire source code, database and backup, original image/logo, administrator account, and work email account. The images uploaded to the server are copies that have been shortened for web use, so even if you download them in their entirety, the original for printing will not appear. Here, the hosting and SSL certificate must be renewed together.

Key takeaways

  • You do not receive everything just because the website is opened. What is taken over is not the screen, but Materials that the next person can continue working onno see.
  • When we checked our web server, the image file was 11,715However, the original file that can be edited is 0It was. Only a web-ready copy is uploaded to the server.
  • Take six ingredients and keep going. Hosting and certificate renewal entityYou can decide together.

I received the folder, but there are no files to edit.

We are taking over the materials to change production companies. When you open the folder, you will find the main banner jpg, logo png, product photo webp, and company introduction pdf. The screen opens as is, but the next company is “I can’t fix it with this.”He says.

This is because what must be handed over is not the finished result, but the materials that can be used to recreate the result.

Even if you receive the entire server, the original does not appear.

We checked how real this statement is with our web server. Files in the webroot were counted by extension (measured on September 2, 2026).

divisioncount
image file11,715 (webp 5,228 · jpg 4,322 · png 1,835 · svg 295 · 35 others)
edit original file0 (psd · ai · eps · fig · sketch · xd · indd · cdr)

Everything that goes on the server Copy converted/reduced for web useno see. So, even if you download the entire server, the original logo for signs or printed materials will not appear. The original is in the working folder on the side where it was created.

Six ingredients you need to get

itemWhat's stopping you if you don't have it?
Server/hosting connection informationI can't change companies
full source codeI can't correct even a single line of text.
Databases and BackupsInquiry and application records are not followed
Original image/logoLogos cannot be used on signs and printed materials.
Administrator accountIt is often located in the configuration file in the source code.
work email accountNo more space to receive renewal notifications

especially Inquiries and applications are stored in a database, not in a file. Even on our site, when an inquiry form is submitted, it is entered one line at a time into the database table. If you only receive the source code, this record will not be followed, so you should also check if you can get a backup.

Two things that never end once you receive them

Aside from the materials you receive, there are two things that have an expiration date. These two The renewer, not the recipientThis must be determined.

  • hosting — Usually only the first year is included in the production quote. If you choose hosting together with our quote, “Web Hosting for 1 year” will be added to the included item. Establish who pays from the second year onwards.
  • SSL certificate — Free certificates have a validity period of 90 days, so automatic renewal settings are required, and paid certificates also expire when the payment person in charge changes or the notification email is lost.

which Renewal notifications will only be sent to your registered email account. If the person in charge has left the company or the account is no longer alive, you will only find out about it after it expires.

Three things to check today

You don't have to get everything. Can the next person in charge continue?is the standard.

  • Are there sources and originals in the folder now? All you need is a web-ready copy, it's not material.
  • Do you access the server and administrator directly? If you don't have an account, you can't move it.
  • Who renews hosting and certificates? Also see which email notifications go to.

If you write down the scope and timing of handover in the contract, you won't have to fight when it's over. We recommend the following statement: “When the contract is terminated, all source code, DB, and account information will be handed over within 30 days.” However, this is a phrase we recommend and is not an obligation stipulated in all contracts., the rights of sources, fonts and images depend on contracts and licenses. We recommend that any contract with contentious issues be reviewed by an expert before signing.

The folder screen shown in this video is a reproduction and is not actual data handed over to the customer. The domain name is On a separate sideIt was covered in .

Full video subtitles (6 scenes)

I received the website, but there are no materials to edit.

What is handed over is not the screen, but materials that the next person can take over.

The folder contains only a copy for the web

I only received the screen, no source, connection information, or original image.

11,715 images, 0 originals

Everything that goes on the server is a shortened copy for the web.

Six ingredients you need to get

Connection information, source, database and backup, image source, administrator account, and work email account.

Two things that never end once you receive them

Hosting is for the first year and free certificates are available every 90 days. Notifications will only be sent to registered emails.

Three things to check today

I am in charge of sources and originals, server/administrator access, and updates.

Frequently Asked Questions

If you download all the server files, won't the originals also come with them?

It doesn't come. The image uploaded to the web server is a copy that has been resized and formatted to display quickly on the screen. When we counted our web server, there were 11,715 image files, but there was not a single edited original file such as PSD or AI. Since the original is required for use on signs or printed materials, you must separately request the original image and logo when handing over.

Is “handover within 30 days at the end of the contract” established by law?

no. This is a phrase we recommend including in your contract, and not all contracts specify such an obligation. The period does not have to be 30 days and can be determined differently depending on the case. What is important is not the numbers, but whether the documents specify who will be handed over and when. Since the rights to sources, fonts, and images also depend on the content of the contract and the license used, we recommend that any contentious contracts be reviewed by an expert before entering into them.

Will my inquiry be followed once I receive the source?

It doesn't follow. Inquiries and applications received on the website are stored line by line in the database rather than in a file. The source code only contains methods for inserting and retrieving that data; the actual records are in a separate database. Therefore, it is a good idea to add the database and its backup to the transfer list, and also check whether “I can download it myself.”

Even though I have a good relationship with the company, should I check it out?

It's much easier to ask when the relationship is good. If you make a request after the contract has ended, it will be a burden on both sides, and if the person in charge changes, it will take time to find the information. You don't need to get everything right away, it's enough to just check where it is and that you can get it upon request. If you include a handover clause when renewing your next contract, you will have fewer questions from then on.

We have outlined how maintenance, repair and handover should be included in the contract.