Request a project consultation
I filtered out over 9,000 bid notices on the KONEPS based on my conditions.
PROCUREMENT, SIMPLIFIED.

The notices you check daily,
now delivered as alerts.

Find a business that fits your criteria from thousands of KONEPS announcements. Save the conditions once and receive notifications of upcoming deadlines.

No usage fee · Search without membership registration · No program to install

SCROLL TO DISCOVER01 / BLUE JODAL
YOUR NEXT OPPORTUNITYFind it at a glance and prepare one step ahead.

This is the composition of the actual search screen. You can combine conditions on the left, and notices that are due soon will be collected and displayed separately above the list. The number of cases and announcements on the screen are examples.

Get started for free
LESS SEARCH. MORE OPPORTUNITY.

Reduce complex searches,
Focus on the opportunities that matter.

Find, save, and even receive notifications. Bidding tasks that were repeated every day become simpler.

BLUE JODALPRODUCT TOUR
01 / SEARCH

What kind of business are you looking for?

GoodsConstructionServicesInternational procurement
Save search conditions separately by area of ​​interest.
This is an example function to help you understand.01 / 03
WHY

What changes?

until now

  • I access KONEPS every day and re-enter the same search term.
  • Search for ordering plans, preliminary specifications, bid notices, and result notices separately in each menu.
  • There are times when you find an announcement after the deadline has passed.
  • The notices found are manually transferred to Excel and shared with the team.

AFTER BLUE JODAL

  • A list with the saved conditions will open on the first screen.
  • We look at seven types of data in succession under one condition.
  • Notices with deadlines within three days are checked at the top of the list first.
  • Save it as an interest notice, download it as CSV, and share it as is.
9,000+ Searchable bid notices View goods, construction, services, and foreign capital in one list.
7 types Connected Procurement Data We will continue to look at everything from ordering plans to patents.
3 days Advance notice of imminent deadline We'll show them separately at the top of the list.
0 won usage fee There are no programs to search for or install without registering.
DATA

From the ordering plan to the successful bidder, the beginning and end of a project

We have grouped the seven materials that we had to look at by going through menus in the KONEPS into one search condition. You can follow one business in chronological order.

STAGE 1 Before the business comes out prepare in advance

Procurement plans

01

Through the annual ordering plan for each institution, we understand in advance which projects will be released in the next quarter.

Quarterly scheduled projectsinventory
business budget sizeamount

Preliminary specifications

02

You will be notified when the specifications are released and will be notified by the deadline for submitting comments.

Comments can be submitteddeadline
Due within 3 daysfirst of all
STAGE 2 When the announcement was made Without exception

Bid Notice

03

We organize announcements of goods, construction, services, and foreign capital based on contract method and estimated price.

Deadline todaynumber of cases
My Conditions Newnumber of cases

R&D business notice

04

Search for R&D project announcements under the same conditions as bid announcements.

Assignments being acceptedinventory
due this weeknumber of cases
STAGE 3 Learn from business that has ended Next bidding criteria

Results Announcement

05

The winning bid amount and preliminary price method are linked to the original announcement to establish the criteria for the next bid.

Successful bid amount/successful bid ratecomparison
Recent ticket salesinventory

Bidders

06

Check the competitive landscape in advance based on the history of companies that have received orders for the same item.

Same product competitorsinventory
Companies receiving repeated ordersrecord

patent

07

We search for related patents in businesses with technical requirements.

related patentsSearch
FEATURES

How to keep only your own from thousands of cases

You just need to create the conditions once and save them. From the next login, the already filtered list will be the first screen.

office usefurniture− Rent

Word-level keyword search

If you use a space, you will find announcements that contain all the words, and the order does not matter. Search for the announcement name, organization name, and announcement number in one space.

No need to change search terms multiple times
Road repairs by regionResearch service · Nationwide

Condition storage and automatic application

Save keywords, business type, contract method, region, and estimated price range and designate one of them as default.

From the next login, the first screen is already a filtered list.
D-DAYD-1D-2

Deadline 3 days banner

Announcements remaining within three days of the deadline are collected separately on the list and displayed along with the opening date and time.

The things you miss and can't put in will disappear.
Hide deadline ONHide not interested ON

Hide Deadline/Not Interested

You can remove announcements that have already been completed and those that have been marked as not of interest from the list.

Lines you don't need to see disappear from the screen
General competitionLimited competition (Level 3)Negotiated contract

Contract method and rating filter

The only conditions left are to participate in a negotiated contract, general competition, limited competition grades 2 to 7, and nominated competition.

Don't read announcements that make you ineligible to participate
CSVNotice of interest 7

CSV export and interest announcement

Download the search results as CSV and paste them into the existing form, and save the items you want to keep track of as interest notices.

There is no need to transfer it to Excel.
Advance specifications and opinions can be submitted4 examples
Delivery of food ingredients for school meals3 days left
educational institution2 comments
Public library book purchase6 days left
public library0 comments
Local tourism fact-finding service9 days left
local government1 comment
Introduction of water quality analyzer for research12 days left
research institute0 comments
PLUS

If you prepare after the announcement is made, it is already too late.

If you receive notification during the pre-specification stage, you may have two to three weeks to review the specifications and submit comments. If you look at the ordering plan and R&D project announcement together, you can see the time to prepare for the next quarter.

  • Receive notification when the pre-standard is released and schedule a review first.
  • We also indicate the deadline for submitting comments so you don't miss the moment to respond to the specifications.
  • Once this notice is posted, we will continue the same project.
FOR

These people are writing

public procurement officer

Opening the KONEPS every day reduces the time spent repeating the same search to just checking one notification in the morning.

Storage conditions + deadline 3 days banner

Proposal/Sales Organization

We accelerate the proposal timing by first identifying the organization's next project through ordering plans and preliminary specifications.

Ordering plan + advance specifications notification

Planning/Strategy Manager

We organize the market size and competitive structure using result announcements and bidding company data.

Result announcement + bidding company + CSV
START

3 minutes to first notification

There are no programs to install or contracts to sign. You can search right away without an account, and you can only use the save and notification functions by creating an account, and receive notifications through Telegram.

1

Create conditions

Enter keywords, job type, region, and estimated price range and check the search results.

Conditions entered
landscape managementServices100 million ~ 500 million
2

Save the condition and set it as default

When you find useful conditions, log in to your account, save them, and set them as default. You can search without logging in, but saving requires an account.

Saved search conditions
Landscape Management · Nationwide · BasicResearch service · Nationwide
3

Create a notification rule

Select one of the conditions saved in the notification settings on My Page and register it as a rule by deciding how you want to receive it, such as a summary of new announcements or an imminent deadline.

Notification Rules
Landscape Management · Nationwide NoticeSummary of new announcementsDeadline imminent
4

telegram connection

Receive a connection code from the Telegram card in notification settings, and connect your account by sending /start and the code to the notification bot within 10 minutes. Bots cannot speak first, so the connection is initiated by the user.

Connection order
Issue a connection codeSend /start to botconnected
5

Check test notifications

After connecting, click Send Test to see if you receive a test message in Telegram. You can check your settings without waiting for the first day your rules work.

telegram message
BLUE JODAL TEST NOTIFICATION
6

Check it every day

From the list to which the saved conditions have been applied, view the items that are close to closing first and add them to the notice of interest. Participation in bidding and bidding takes place at the KONEPS.

What to check today
4 cases approaching deadline31 new cases

BLUE JODAL / INTRODUCTION

See it in action

Explore the key features and how to use them.

1:02Korean audio & captions

FAQ

Frequently Asked Questions

How is it different from seeing it in person at the KONEPS?

In KONEPS, you have to re-enter the conditions each time you search, and the ordering plan, preliminary specifications, bid notice, and result notice are in separate menus. BLUE JODAL saves conditions and continues viewing seven types of data from the same list.

Is there a usage fee?

Currently available search and account functions can be used at no additional charge. Condition storage, notifications, result notification viewing, and CSV export are all included. We will notify you in advance when new paid features are added.

Do I have to register as a member?

You can search without logging in. Create an account and use only functions that require personal settings, such as saving notices, saving search conditions, and receiving notifications.

How should I enter keywords?

If you use spaces, you can find announcements that contain all the words, but the order can be different. For example, if you search for “office furniture,” you will find announcements that contain both words, such as “purchase office furniture for government office.” You can also remove leases by adding negative words.

Can I save multiple conditions?

You can save multiple conditions for each division or item, and designate one of them as the default. Default conditions are automatically applied when you enter the search screen.

How often are announcements updated?

The collection process runs every few minutes to receive new and revised notices. Canceled or reposted items are displayed with tags in the list.

How do I receive notifications?

We are currently sending it via Telegram, and email notifications are being prepared. Notifications for the same notice and for the same reason are sent only once, so the same content is not repeated.

Can I bid right here?

You cannot participate. BLUE JODAL is a search service that searches for and manages public notices, and bidding and electronic bidding must be conducted at the KONEPS.

START TODAY

Check out the announcement due today.

Even without registering as a member, you can search immediately by entering a single keyword. There is no usage fee.

Contact

A rough idea is a good place to start.
Let’s shape your project together

Tell us where you are and what you want to achieve. We’ll outline a practical scope, process, and estimated budget.

4 questions · about 2 minutes

Scope

What would you like to work on together?

Select as many as apply. If you are not sure yet, choose “Other”.

Budget

What budget range do you have in mind?

Even a rough range helps us shape the proposal.

Project details

Tell us where you are right now.

It does not need to be polished. Tap an item below and the outline is filled in for you.

0

Upload up to 2 RFPs or reference files. Supported: PDF, PPT, Word, Excel, JPG, PNG, ZIP

Contact

Where should we reply?

Scope, budget, project details and contact information are required.